
A
D
D
E
N I
D T
U E
M M DESCRIPTION
Addendum 1
Page 4
1.29 Revised 02 East Elevation to address grade slope, changed MWP1 to scored EIFS, and added panels of
cultured stone.
1.30 Revised Keyed Notes as follows: changed note 5 to “Not Used”, changed EIFS color from “Citrus” to
“Social Butterfly” on note 18, and noted that the Prefinished Aluminum Panel System as “By GC” on
note 19.
SHEET A102 Building Sections (Full Sheet Reissued)
1.31 On 01 Building Section, enlarged detail reference to coordinate with section 01/A103, revised bent metal
plate, and added siding graphic to roof top enclosure and showed openings.
1.32 On 02 Building Section, revised exterior wall to reflect grade change and material change, revised
location of patio gate to coordinate with plan, and added siding graphic and showed door on roof top
enclosure.
SHEET A103 Wall Section & Details (Full Sheet Reissued)
1.33 On 01 Wall Section, lowered faux beer taps, eliminated recess at taps and added metal trim on sides and
top of tap display.
1.34 On 02 Wall Section, revised bent metal plate and added gypsum board above Nichiha panels.
SHEET A104 Wall Section & Details (Full Sheet Reissued)
1.35 On 01 Wall Section, revised exterior wall to reflect grade change and material change.
1.36 On 02 Wall Section, revised location of patio gate to coordinate with plan and added gypsum board
above Nichiha panels.
SHEET A200 Floor Plan (Full Sheet Reissued)
1.37 Added wall section reference at Entry and partition type reference at bar low wall near POS station, and
flipped the direction of the wall section reference 01/A102.
1.38 Revised the orientation of the mechanical room and grease recovery tank.
SHEET A203 Interior Details (Full Sheet Reissued)
1.39 On 01 Booth Wall Elevation, removed flat screen TV.
1.40 On 23 Acrylic Wall Divider, revised wood trim at base of acrylic panel.
SHEET A400 Floor Finish Plan (Full Sheet Reissued)
1.41 On 01 Floor Finish Plan, added walk off carpet tiles on the dining room side of the kitchen entrances.
1.42 Revised Finish Schedule to add walk off carpet tiles CTP2 to Flooring material, and removed SS2 and
revised SS1 to be “Concrete” color.
SHEET A500 Reflected Ceiling Plan (Full Sheet Reissued)
1.43 On Key Notes, revised note 6 to change the detail reference from 2/A501 to 13/A501, and to note that the
suspended ceiling cloud to supplied by millwork vendor but assembled and installed by GC.
1.44 On 01 Reflected Ceiling Plan, added key note 6 to ceiling cloud reference at ceiling cloud in Bar area.
Kommentare zu diesen Handbüchern